Tuesday, July 4, 2017

# 571 - A Country House and Back to Blogging

Years ago I began blogging. So much happened over those years. We went through our house being destroyed by Hurricane Ike, getting our kids through high school and then college, selling our house in Greater Houston, then moving to our acreage in the country and living in an RV for nearly three years as we built a house.


Weather conditions were difficult as we got started. It took much longer to clear the site for the house because of constant rains. It was awful. The large equipment couldn't maneuver in the muddy ground, so we had to simply practice PATIENCE.


It was difficult to imagine a house standing on the acreage we'd owned since our kids were young. David was determined to get his wrap-around porch...that was his non-negotiable feature. Mine was to have large rooms, especially nice sized bathrooms. We've owned homes with TINY bedrooms and this house wouldn't have tiny accommodations.


Another feature we both longed to have in our country house was dormer windows, and we got them...three of them. I love that they are well balanced with the size of the house because sometimes a dormer window can end up to look like an afterthought. Our builder did a fantastic job.


The house is just over 3,000 square feet with over 2,000 square feet of wrap-around porch. Crazy porch space, but that is David's dream.


We kept the forested landscape all around the house. Of course, that's not difficult to do since we live in the Big Thicket.


Our detached garage became a huge construction project in itself. We decided to go all out. On a solid, re-enforced foundation, we built an oversized two-car garage with extra space aside, a four-car carport, and a loft overhead that's over 900 square feet that we use as "attic" space for the time being. We build a full staircase inside the garage to lead up to the loft. I had intended that space to serve as part attic space with a separated area to be used as my art studio. However, this house is such a huge undertaking that it will probably take another two years to wrap up the main house, so the loft continues to serve as an attic storage space. I must say it's wonderful to walk into the attic and to not be cramped.


We now have our garage and attic full of many of our belongings and many things of all size...furnishings, boxes, appliances, etc., that our oldest daughter has stored there for the time being. We are ALL looking forward to the day when they can move their big ticket items out of these spaces so we can use the garage as the wood workshop David truly needs to utilize since we must do many projects to finish this house. For now, we look like true Rednecks with far too many things on our wrap-around porch because they will not fit in this huge garage that's stuffed with everyone's things. We will be working that out this year or me and my daughter will be having a garage sale!


Our builder had been waiting for the bad weather to clear out so he could start construction on our house. It was a miracle, but once he began building from the floor to the metal roof...we did not have ONE rainstorm. The weather remained dry and hot while they built the shell of the house, which pleased me immensely. This was indeed a huge and unusual blessing!

I have loads to catch up with on this blog. I had a problem with pictures, but it seems that issue is resolved, so perhaps my loaded pictures will no longer disappear and that's a great motivator to return to regular blogging!

As for construction on this new home...we have a long way to go to finish, but we are thrilled to be fortunate enough to live a dream. Each day is a challenge and a learning experience, but the rewards of doing so much of the work ourselves is beautiful.

Today I'll be putting up a couple more shelves in the closet of a the downstairs guest bedroom. Each small step puts us closer toward enjoying the house of our dreams.

Monday, November 9, 2015

# 558 - Country House Update...WEATHER Stalls Work

The house is coming along. Over the past few weeks the weather has truly interfered with construction progress. It is difficult because I can see in this house in the distance, through the woods, yet we cannot move into it yet.





The above view is from a second downstairs bedroom or from a room that can be used as a den.

The hardy board is primed a yellowish color...yet to be painted.

My husband has taken care of most of the electrical requirements for the house because the bids were astronomical, so he's now been doing things in a significant manner so we can finish the house.


I've worked extremely hard to keep our budget within strict boundaries. That doesn't happen easily. And things have come up, of course, that have blown the budget to a degree.

The plumbing has been a hefty expense, but our plumber is very experienced, which counts for a lot. The septic tank is a separate expense and will be a few thousand more than expected because our soil dictates that a gravity-fed system is impossible, so an aerobic system is required. But, I adore our plumber, a Cajun from Louisiana; he's very experienced with designing great plumbing systems with efficient layout, but he strictly does pipe plumbing for the house and the septic requires a completely different crew.

As a former city girl, I had not truly understood that these were such separate areas...plumbers and septic installers are not necessarily one in the same.


Another area that we didn't plan for was the piping from the water main to the house...Sgt. Dave is currently running 1 1/2" schedule 40 piping from the main to the house for the plumber to connect so we will have running water.

The septic workers haven't been able to come do the installation because the weather won't allow the heavy equipment to be operated in the mucky mess. And we can't spread the Rye seed until the septic is installed because it will just be ruined by the septic crew. So, for now, we have a muddy mess surrounding the house.

The larger piping from the water main to the house will be better able to handle the proper pressure needed to transfer and disperse water to the house. So, a lot of underground piping will need to be done properly so the house can actually be connected to the water supply.

Here is the back of the house and the general area, likely, where
the septic system and leech field will be located.

Back to the electrical part of construction...The electrical was shockingly expensive. Our builder is normally within an accurate guessing range of $500 to $1,000. for each area of work needed to finish the house, but even he has been astounded by sky high estimates for electrical work.


For instance, one company gave a quote to ONLY run electrical wire through the house. Sgt. Dave drilled all the holes through the 2x4's, and he installed all the blue outlet/switch housing boxes. We were supplying all materials to strand the wire, and they wanted almost $10,000. just to string the wire, that's it.

The way the stained glass windows look from the porch
when there is a light turned on inside the house via electrical cord.

The great thing is that I managed to save us thousands by drawing, re-drawing and again drawing our house plans that were carefully followed by the builder. I consulted with too many experts, did too much research, and took too much time to carefully consider every single detail for the layout of this house. Working to understand the most efficient layout for plumbing, the most desirable kitchen design, and to build a house with GREAT closet space has been crucial for me. Working in real estate for years definitely helped.

And it was a challenge to find the best appliances at the deepest savings...the work to get this house built has been stressful and never-ending. The hardest part for me is that even in my "down" time, my brain is in continual high gear and processing the things that need to be done, the order of events so we don't spend extra money or time trying to correct a needless mistake, and I must make sure that the people I must stay in contact with understand everything that is happening with other contractors and time-lines so they never step on each other's toes. It's been a massive juggling act.

However, things have definitely slowed down. Much has been accomplished, but as the saying goes, "The devil is in the details." It is true that the details are the most challenging and difficult part of the process.

Still, the expense to build a custom home in a rural area is significant.


There are other ways I've learned to save a great deal of money. For instance, I don't make one trip to Lowe's or Home Depot without KNOWING exactly what I am going to buy and the research has already been done with extensive notes ready for referral. We cannot afford, money-wise or time-wise, to be wandering through the store, and we can't buy things that are unnecessary or the wrong item. Sometimes they don't have the things we came to buy. That stinks.

At the start of the process, I bought a college notebook with ruled pages to take extensive notes, and I carry that sucker with me everywhere. It is filled with crucial measurements, layout information, directional details...such as which side the tub skirt and drain should be facing, etc.

As for me, I had to design the bathrooms to fit the tubs, showers, toilets, sinks, etc., and let me tell you that there is much to consider with room layouts...shower pans/basins, type of tub, direction of drain, placement of drain, height of shower walls, types of shower doors, desired depth and length of shower space and much more. I've seen my share of HORRIBLE bathroom layouts, so let's keep our fingers crossed that my planning and efforts will pay off with un-horrible bathrooms.

So far, the most exciting part of the rough-in process has been to see the HVAC system be installed. The crew built the rigid runs on the job-site and used rigid as much as possible, but in some areas flex duct was required. The attention to detail was awesome. I stand in each room and look at the vents and imagine what it will feel like to have cold air or heat blasting through them.


Because the house has a story and a half with a vaulted ceiling across almost half the house, I knew we needed a dual-zoned air-conditioning system. This means we would have two systems with two thermostats.


I spoke with a total of three potential HVAC contractors and one of them didn't want to install a true separate zoned systems...he wanted to put in one 5-ton unit. This guy tried to convince me that this one unit would do the job, in Texas, with a second floor of multiple rooms and high ceilings. The HVAC company I ended up hiring was in total agreement regarding the necessity of the separately zoned system and the owner of the company clarified the reasons the one 5-ton unit would not be efficient, specifically due to the design of the house.


Where space is tight, they installed flex ducting.


Having one 5-ton unit would have perpetually created zones in the house that would either be too hot or too cool...controlled temperatures would have been more difficult. With one unit, getting the entire house to a feel-great consistent temperature would have been impossible.


We also went with a heatpump, which these days can be switched off when not needed. The heat-pumps of today are not the same as they were a few years ago. They can save major energy and when not needed, you just flip a switch to turn them off.

We are also have two 4-ton blowers, which will truly help blast the cool air throughout the house.


I've already gotten the estimate to get the house insulated with the blown-in expanding foam insulation that is top-notch. One of my HVAC workers said that once that insulation is in place that the interior of the house will be the same as a YETI Ice Chest. That cracked me up. I don't know how they'll get the insulation in the area behind the air-conditioning units, but we will see.


But, we can't move forward with the insulation until the plumbing, HVAC and electrical is finished being roughed-in. Almost there...just electrical needs to be finished and then we can roll forward.

And, the kitchen cabinets are going to be a dream-come-true for me and my husband. At this time, they are in the process of being built. Our cabinet builder even MILLS HIS OWN WOOD. He is incredible. I was in disbelief that our kitchen cabinetry, custom built AND installed, is LESS money than buying the ready-made-to-install cabinetry at the local hardware store. I had never dreamed of being able to have a kitchen as we will enjoy because Houston prices were off the charts. This is one area where country living has paid off.

I have already researched, priced, ordered and paid for our kitchen appliances. All Kenmore Elite appliances. They are sitting in a warehouse waiting to be delivered and installed. I was able to buy high-end appliances by sticking to a budget, being patient, ordering through our Sears Hometown store that had the freedom to come down even further off the advertised sale's price while ordering multiple appliances also reduced the overall cost by another 15%. Ordering on a holiday weekend made the sale prices even better.

Our Sears Hometown store is also delivering and INSTALLING all the appliances for approximately $87. - a one-time fee for all appliances to be installed. The only thing they won't do is connect water/plumbing lines, so I already purchased all the connections for the dishwasher and refrigerator water/ice-maker for Sgt. Dave to hook up during the Sears installation. Since the double-ovens weigh nearly 300 lbs, this is a valuable benefit of working with the local store...ordering through a regular Corporately owned Sears would've meant a much higher price for at-home delivery and installation.

As for kitchen countertops, I am still exploring options. I am old-fashioned and love tiled countertops because of the texture and depth, but the grout lines are not good for some food prepping, such as baking. So, the island will likely have granite.

Another expense was garage doors.


After calling around to price different companies, I was surprised to discovered a significant difference between one local company and another that is about 40 miles further away. The one further away was at least $350. less for the same door.


So, we installed two insulated garage doors and purchased decorative perimeter weather stripping and it cost right at $1,565.00. for both doors, installed. Not Bad!


After next weekend, we will officially begin locking the doors to the house and garage.

This is the house BEFORE the full beams were added around
the entire porch. Beefy beams.

But, the BEST feeling was to see the first tub installed upstairs. This tub is porcelain over steel and cost only $110. at Home Depot!


The Master Bathroom will have a regular tub, but with a more angled back to allow for soaking. We decided to not get an over-sized corner or garden tub because the water usage would be ridiculous and that's not great for a septic system...too much water can cause hydraulic overload. So, we remained conservative in these areas.

We have three bathrooms and have these toilets. It is interesting.


This toilet has two flush options on top of tank. Let me break it down for you...there's a PeePee flush option that uses less water, and a second Poo-Poo flush option that uses more water and pressure to SWISH the poo AWAY! Eventually, I will let you know how these work.

And to catch up...In September, me and my daughter Stefie made a road trip to see my oldest daughter since she had just given birth to their first son. We had a wonderful few days at the Johnson house. Stefie had a great time giving Coraline extra attention; it isn't easy suddenly becoming a big sissy!


Hank was 9 lbs 6oz when he was born in a birthing center as my daughter delivered him completely natural. Heather is amazing. I have two grand-babies now. I've been back a couple more times for visits since his birth, but this first visit with Hank was awesome.

Me and my week old grandson, Hank.

It was wonderful to hold my grandson and worth the crazy road trip to get there! Stefie and I laughed so hard and had such a wonderful road trip together that I'd do it again in a heartbeat with her.

My daughter and son-in-law, Heather & Henry with their babies...
Coraline and Hank. Their family is beautiful.

Heather is a very busy momma with TWO children!


Getting our house finished is extra important. Our family is growing. We all love each other and want to spend more time together. For me, this time of living in an RV for over 2 1/2 years has been extremely difficult since I am super involved with my family. There were moments I'd love to just walk away and say FORGET IT...then we drive into the city and remember the increasing congestion and the conveniences aren't worth it.

This time of great sacrifice is for a bigger reason...being patient a little longer is my requirement. Well, being a patient a LOT longer is going to be necessary, but we will keep going and enjoy the journey.

Friday, August 22, 2014

# 524 - Country Home Construction - Sneak-Peek Preview of Exterior!

Well, here is the house that we will have built...with some tweaks.


It will not have the log-cabin siding, but will have hardy-plank that will be painted white, with a dark grey metal roof for contrast.

Sgt. Dave used an ap that kind of gave the house the look it would have with our supplies, colors and trim. I'm standing on the front porch of this picture, texting someone.


Our look will be more in keeping with a Colonial Farmhouse style.


The main living room and formal dining, well, the only dining room, will have vaulted ceilings and lots of natural light. You can catch a peek in the photos I am sharing.


Upstairs, there is a small loft area, a bathroom, a bedroom with nice sized walk-in closet and a functional hallway that will have bookshelving and room for storage and a second bedroom that will only have enough space for a twin size bed, but it will provide extra bunk space.

The builder is standing in the photo below with Sgt. Dave --- they are standing in space that will become our master bathroom. It is roomy and will be full of natural light.


Normally, I do not like staircases, unless there is a landing, at least one, to help break any fall that might occur. However, this stair will have sturdy railing at the side of banisters and probably a wall rail for additional safety. I think it will be okay. At the bottom of the staircase, it will be blocked by a custom-made gate to prevent any people or pets from going upstairs without us knowing.

In the shot below, Sgt. Dave is standing inside our Master Bedroom. I like the location. We have a lot of sound buffering because our bathroom and master closet seem to encase us into that corner of the bedroom. But, we might add a door from the master bedroom to lead us to the screen-in back porch. That would be enjoyable.

 
The ceilings in the master are not too high, they are just right. I don't want that window on the backwall where Sgt. Dave is standing---it has to go. In fact, that is the headboard wall and I don't want any solar heat coming through that wall, so it will likely be windowless and the other wall will have the beautiful outdoors coming indoors through a pair of great French Doors.

The room below...well...that's our master closet! Isn't it awesome? It's about the same size as the closet in our last home. It will have some built-ins to make it for efficient and to glamorize it a tad so that my country life will not dictate my wardrobe.


Here's another shot of the master closet.


The photo below is looking through the kitchen area to the large Mud Room with the backdoor. It is great and will also be tweaked, until just right for our needs.

We will need to re-configure the current plan for the A/C ducts, etc., as ours will be much higher on the wall so that we can use that space underneath as a hallway to walk to another room upstairs at the end of the house that would have been closed up as wasted space. We are using creative construction so that we can utilize every spare bit of living space this house has to offer.


The other home-owner has their house designed with the kitchen separated from the rest of the house, but that wont work for me. I must have my kitchen be part of the flow of traffic through the house - it's a critical room toward making things happen for every event. We all want to be together. So, I am moving the kitchen to where the kitchen has a straight line of vision all the way through the dining room and to the end of the living room. My sink will position me so that I am able to overlook everything while washing dishes.

Our house has ample architectural drama that will make the best of our natural light and the vaulted ceilings.
 

I love the openness of the house.


 The porches, we might do a tad different, but these are eight feet wide across the front of the house. Plenty of room for porch swings and hammocks.


 Our own view across our acreage will be very similar to what you see in the photo below.


 Very nice porch - the main porch across the front of the house.


Eight foot wide porches across front of house. Plenty of front porch moments will be seen across that space over the coming years.

 

 We will definitely have a covered carpet built with a drop-down-ladder for accessing the carport attic. Our wish list had been that we make that vaulted space an additional hang-out/living space for kids and company. So, we will see how it goes and how much more money it will cost to make this happen, if so, we will build the lower part of the garage with walls to enclose the space and build a true staircase to access the vaulted room. Perhaps we will build a safe walkway coming from the garage vaulted space to the upstairs loft in the main house. We shall see. I would like for the floors of the garage to be concrete, but we will probably do these after market to save money and to keep taxes down.

 
  
With hard work, we can build our dream home. It will take time and lots of careful planning, but I am now working on making the floorplan suit our lifestyle. At least we have the main parts of the construction process decided upon.

Our builder is easy to work with. He goes fast. He is a true custom builder and will move walls, ceilings, and do whatever you would like for him to do. For now, I am just thankful that we found a house that speaks to me...I BELONG TO YOU!

As I go along, I will share the changes we are making to the floorplan. Some of them will be unique. Some will be functional. Some will increase our storage and others will make our house a true home to enjoy.

I feel very fortunate that we are able to build a home that we both will love. Sgt. Dave and I look forward to enjoying our first candle-light dinner in this house....the celebrating of this milestone is important to us.

And then, we invite all the family for the best family gathering ever! In fact, we've already been stocking up on some AMAZING fireworks and we will have the first gathering begin with a really big bang and sparkling lights along with great food and a lot of laughs.

Closer and closer, every day. I am happy and grateful!